Design Criteria Submission -04-07-2025
Dwg-Topo-Road-K Profile & Coordinate
PROJECT
1-Project Staging ve Master Plan Drawings
2-Zone-K Road and Infrastructure Drawings
3-Zone-D Road and Grading Drawings
6-Population Forecasting and Water Demand Report
Review Comments on Wet Utilities – Design Criteria Submission
Benghazi City Infrastructure Project-Design Criteria Report_R00
Design Development Framework Rev.01
Population Forecasting and Water Demand Report
Waste Water Treatment Plant Preliminary Report
Transmission Line General Layout
DATA FROM LIBCO DRIVE
1-project Staging and master plan Drawings
Zone-K Road and Infrastructure Drawings
Zone-D Road and Grading Drawings
population Forecasting and Water Demand Report
MAP- RINEX DATA- data Ortho-photo
Transmission Line Hydraulic Analysis and General Layout CAD/PDF files.
Design Package - Stage 01 (20/07/2025)
01-Geological Assessment Report
Master Plan for Population (24/07/2025)
Project Specific Design Criteria-Wet Utility & Electricity (26-07-2025)
Transmission Line Project-Specific Design Criteria_R00 (31-07-2025)
Clarification for New Master Plan and Water Demand Calculation of Ganfuda
Stage-1 Design Package Resubmission (28-07-2025)
Stage-1 Road Design Package-road type key plans [04/08/2025]
Transmission Line Schematic Design Report (07-08-2025)
ZONE K - LANDSCAPE CONCEPT PRESENTATION & CAD Drawing
Geotechnical Investigation Proposal (13-08-2025)
Libya Gangfuda Zone K - Landscape Concept Presentation Drawing
Water Transmission Line Project- Part 1 of 2 - ( Project Specific Design Criteria)
updated Zone-K Road and Landscape Design 25-08-2025
proposed Potable Water Distribution System Schematic Design Report